Case Study

Expro delivers offshore excellence: safety, speed and savings with Blackhawk Cement Head

In Brief

Expro delivers offshore excellence, combing safety, speed, and cost savings with the Blackhawk Cement Head

Region

Customer Challenges

Cement head management:

  • The customer was required to demobilize the cement head after every job for onshore inspection and redressing, resulting in operational inefficiencies 
  • During previous campaigns, residual cement debris was repeatedly found inside the cement head, rendering it unfit for immediate reuse and contributing to project delays

Dart reloading capability:

  • The customer needed a cement head design that allowed darts to be reloaded on location without removing pup joints, enabling faster, safer job preparation • In an earlier operation, the cement head became detached when the rig inverted it to break out the upper pup joint, causing one fully day of non-productive time (NPT)

Safety improvements:

  • A key customer priority was to reduce personnel exposure within the Red Zone by adopting equipment and processes that enhanced operational safety

 

Expro Excellence

Enhanced safety:

  • The Blackhawk Cement Head with Skyhook system removes the need for personnel to enter the Red Zone at any stage of the cementing operation 
  • By integrating hands free handling and controlled tool positioning, Expro’s solution significantly reduced physical exposure and improved overall operational safety

Improved Operational Efficiency:

  • The proprietary QuikLock™ connection, which is included on all of Expro’s Blackhawk Gen-II & Gen-III cement heads enabled, fast, on location dart reloading without having to break out pup joints 
  • This streamlined process reduces rig floor activity, shortened job preparation time, and enhances both safety and workflow efficiency

Reliable Internal Cleaning:

  • Our purpose built cage design ensured continuous mud flushing through the cement head’s internal diameter 
  • This eliminated the need to stop circulation to clear bypass channels - an issue common with previous cement head designs - ensuring reliable, repeatable performance across runs

Reduced Logistics & Cost Savings:

  •  Expro’s cement head was designed to remain offshore between jobs, eliminating the requirement for onshore redress or cleaning
  • This reduces logistics handling, minimizes vessel movements, and lowers both planning and operational costs for the customer

 

Value to Client

Faster preparation for subsequent operations:

  • Our solution saved 2 hours on cement head preparation for each job 
  • We had no requirement to invert the cement head to break out pup joints, reducing operational steps and simplifying the workflow 
  • Minimized the risk of damage to rig equipment and removed unnecessary personnel exposure on the rig floor

Reduced cement line handling:

  • Expro’s Skyhook system enabled rapid connection and disconnection of cement lines, saving around 1.5 hours per operation 
  • Workflow becomes significantly more streamlined, reducing manual handling and improving efficiency

Enhanced personnel safety:

  • Cementing operations could be completed with personnel fully removed from the Red Zone, supporting the highest safety standards 
  • We eliminated the need for man riding activities, significantly decreasing the likelihood of safety incidents