Our Client Petrobras required to confirm barrier integrity for a well located in the Campos basin, offshore Brazil
Industry regulations required that integrity monitoring was in place toextend the temporary suspension for the well
If the temporary well suspension could not be extended the client would be required to perform a costly well intervention with a deep-water rig to fully P&A the well
Expro Excellence
Expro was contacted to see if there was a possible solution to use the CaTS system previously installed in the well to now provide well integrity data
Expro previously installed a Multi Gauge and Repeater CaTS system into the well which achieved the initial monitoring objectives and was no longer being utilized by the client
The client needed to obtain pressure and temperature data from below an upper barrier plug below which the CaTS repeater station was installed to confirm the well integrity
Expro's solution was to wirelessly re-purpose the repeater station as a monitoring position in the well and recover to surface pressure and temperature data via the systems duplex communication
The proposed solution was fully tested onshore by the local team and then successfully executed offshore, and data provided to the client
Value to Client
Significant cost savings were realized for the customer as they took advantage of an already installed CaTS system to meet the monitoring objectives versus a costly offshore intervention to P&A this single well
The total cost of data upload operation was under 5% the estimated full P&A intervention cost
The client was able to defer the future P&A intervention for this well for a few years allowing them to avoid breaking into rig schedules impacting other operational priorities