Operator was collecting periodic bottomhole samples from onshore wells in Eastern Europe, to perform fluid characterization, develop reservoir models, and meet regulatory requirements
Previously, samples were transferred directly from bottom hole sampling tools into transport bottles and shipped to the laboratory or storage facility
Occasionally, the laboratory found the samples were invalid – either contamination from drilling activity, or samples had been collected from the wrong zone
By the time samples were found to be invalid, the rig had moved on, and further samples could not be obtained
Expro Excellence
Expro proposed to deploy the TurboPVT transfer system, providing onsite, real-time validation of sample quality during transfer from sampling tool to transport bottle
Samples were restored to above reservoir pressure, to maintain their single-phase condition, and transferred via TurboPVT to transport bottles
During transfer, fluid properties such as density, viscosity, and permittivity were monitored in the live samples, confirming volumes of gas, oil, and water in the samples
Samples were confirmed as valid, and the operator could move on to the next well
Value to Client
The operator was able to move on to subsequent operations, confident that they had obtained representative samples from the target zone
Samples were transferred into lower cost transport bottles, saving on rental costs of openhole sampling tools
Samples remained in single phase for the duration of transfer
Initial PVT data, including pressurized density, was available onsite, allowing immediate characterization of the reservoir and reservoir fluids
If samples had been found to be invalid, further sampling runs could be conducted with minimum delay