Expro supports client with subsea safety system on Jack Up operations

In Brief

Expro's SSTTA reliability demonstrated during jack up deployed subsea completion operations

Product Line

Customer Challenges

Expro’s client had the requirement for a subsea safety system on a jack up to provide well barriers and coil tubing cutting capability during completion deployment and well flow back operations

Expro Excellence

  • Expro supported our client with the provision of a primary and back up SSTTA system, along with surface tree, hydraulic flat pack control liner and hydraulic control system
  • Equipment was deployed ‘in-hole’ for 93 days (over 2,200 hours) and operated 90 times with no operational downtime attributed to Expro equipment
  • JPR compiled by client with 100% score for both equipment and personnel

Value to Client

  • Expro maintained operation up time during the extended completion deployment and commissioning operations
  • Expro’s equipment provided coil tubing cutting capability below the rig drilling Blow Out Preventor (BOP), ensuring safety integrity during the completion commissioning campaign