Expro provides toe sliding sleeve solution for HPHT wells, eliminating intervention by coiled tubing thus saving rig time whilst improving efficiency and safety
Expro approached by a major operator in North America to provide a solution following several sequential failures of their existing provider’s toe sliding sleeve
Scope of work had extreme HPHT wellbore parameters:
Bottomhole temperature (BHT) of approx. 320°F (160°C), with plans to hold the tool downhole for up to 90 days before opening
Understanding the operator’s critical downhole requirements using Expro’s modelling application an engineered toe sliding sleeve was proposed and approved
Bottomhole conditions required seal components and system requirements
Modelling indicated that Expro’s toe sliding sleeve should open at approx. 12,320 psi surface pressure – after 40 days cemented downhole and subjected to temperatures of approx. 320°F, the sleeve successfully opened at 11,700 psi
Expro team in Oklahoma City built, pressure tested the tool to ensure no leaks, and then installed the tool in the wellbore, with 100% success rate
Value to Client
The toe sliding sleeve eliminated interventions by coiled tubing saving rig time and improving efficiency for the operator
Improved safety due to reduced personnel on location
Reduced costs as it allows for several wells to be opened before expensive frac equipment is deployed to location (they can then frac several wells sequentially for maximum efficiency)