During routine pressure/temperature logging, the incumbent service provider was unable to retrieve logging tools from the client's geothermal wells (>300OF)
Assuming there was a casing integrity issue, the client sought an alternative solution to running gauge rings or a caliper log
Expro Excellence
Expro's high temperature downhole video was deployed to 971 feet (325OF) and confirmed parted 13 3/8" casing, causing rock and cement entering the wellbore and trapping the logging tools
Running additional logging tools could have potentially been caught in the split casing and either damaged or irretrievable
Value to Client
Running the high temperature camera saved the client 16 hours of rig time and two runs downhole
Visualisation of the parted casing provided detailed images of rock and cement through the gapping split enhanced decision making for cost-effective remedial work
The client now routinely deploys Expro's downhole video cameras within their maintenance programme (up to twice a year in older wells) due to the fluids in geothermal wells being highly corrosive - invaluable data avoids costly repairs (for example c. $1.5 million to repair the well or c. $5 million to cement the well)