A major geothermal operator in the Netherlands was seeking to undertake workover operations on their production well including flushing, casing patches, ESP installation and slickline runs
All operations were required to be conducted using a rigless approach
The customer had a focus on zero NPT and HSE issues for this project
Expro Excellence
Expro deployed a Rigless Intervention Unit (RIU) with pick up/lay-down services and Tubular Running Services to execute the workover operations
Operations included dressing the polished bore receptacle, running and setting the packer and seal stamp, completing scraper and pressure tests, and installing two patches
The casing and ESP pump were pulled from the well and re-run with control lines. Mud was effectively managed and red-zone exposure was reduced through best practice and our advanced technologies
This well was displaced, junk baskets were run, emergency packer was set and released, returns taken to the surface, and slickline runs were completed
Value to Client
Expro successfully delivered the workover scope enabling the customer to return to operations
This project demonstrated Expro's excellence to deliver under evolving conditions and amplify our safety record with zero NPT or HSE incidents
Our integrated service offering streamlined operations, delivering significant time and cost savings while optimizing overall efficiency for the customer