Expro’s 14” BRUTE® Storm System was deployed on a deepwater drillship in the Gulf of Mexico during the 2020 Atlantic storm season
Following the installation of the 9 -3/8” liner, Hurricane Laura interrupted forced the operator to halt operations and suspend the well
Expro Excellence
With limited time and no opportunity to retrieve the liner hanger running tools and landing string, the operator opted to suspend the liner running BHA below the 14” BRUTE® Storm System
The 14” BRUTE® Storm System successfully suspended the wellbore with 550,000 lbs. of hang weight below the packer and a verification pressure test of 2,300psi
After 21 days, the 14” BRUTE® Storm System was successfully retrieved from the wellbore without incident
Value to Client
Expro enabled the operator to suspend the well quickly using a high tensile load, allowing the rig to move out of the storm’s path without delay
The BRUTE® Storm System avoided the need to pull additional tailpipe due to the packer constraints, potentially preventing the rig from being caught in a dangerous storm path
Despite some damage sustained during evacuation, which extended downtime to 21 days, the safe and incident-free recovery of the BRUTE® Storm System prevented any further delay in the well schedule