Case Study

Repairing Collapsed PBR and Isolating Open Hole

In Brief

A 4.5 in. completion consisting of 25 frac sleeves was set too deep in the well exposing 20 ft of open hole between the top of the liner to the bottom of the previous 7 in. casing shoe.

Product Line