A major Middle East operator aimed to drill an extended (6,341ft), 6” lateral in a single BHA run while maximizing ROP. Previous wells faced severe stick–slip, high vibration, and frequent RSS and M/LWD tool failures, causing inconsistent ROP and multiple unplanned trips-preventing the one mile per day target
Achieving this goal required pushing drilling performance beyond historical limits while protecting BHA integrity and ensuring tool reliability in a sensitive drilling environment
Expro was selected for its strong track record in drilling dynamics optimization. The engagement focused on stabilizing downhole behavior, reducing vibration related tool risk, and enabling a single run, high efficiency lateral
Expro Excellence
Expro deployed the HI TOOL® within the RSS BHA to actively suppress torsional, lateral, and axial vibrations. Strategically placed at the top of the BHA, the tool isolated the bit, RSS, and MWD/LWD from disruptive drill string dynamics. This configuration enabled smoother torque transmission, enhanced bit efficiency, and greater stability under elevated RPM and WOB conditions
With advanced drilling dynamics management, the operating parameter window was safely expanded. Expro expanded the safe operating window, delivering maximum energy at the bit while maintaining smooth, controlled drilling
This approach allowed the operator to push performance further, reduce dysfunction risk, and drive consistent high ROP drilling across the long lateral interval
Value to Client
Expro’s HI TOOL® solution delivered significant operational and economic value, enabling the operator to achieve the highest performance levels recorded in their Middle East field
By stabilizing drilling dynamics and unlocking higher ROP capability, the client was able to drill faster, safer, and with greater confidence in BHA reliability
The ability to drill the entire 6” lateral in a single run eliminated the need for an additional BHA trip, reducing operational risk, minimizing NPT, and lowering overall well cost
Overall, Expro enabled the client to surpass their one mile per day target, deliver record breaking performance, and establish a new benchmark for future wells