A client in Saudi Arabia requested that an NC50 DAV MX be positioned in the 8-3/8’’ BHA due to a possibility of losses whilst drilling the section.
The plan was to drill from 10,959 ft to 13,293 ft with 130 pcf (17.381 ppg) OBM.
During the drilling of the 8-3/8’’ hole section, the well encountered patrial losses which resulted in a well control issue due to lack of hydrostatics at depth.
The well was shut in for three days to kill the well, the mud weight was raised to 142 pcf (19 ppg). After increasing the mud weight the well saw dynamic losses (200 gpm 150 bph).
Using the Alternative Diverter Dart (ADD) allowed the DAV MX ports to be opened and closed at surface and very quickly without the need for another dart drop. An important benefit in an unstable well.