Case Study
The presence of the HI TOOL® placed above the LWD tool allowed for an efficient redistribution (decoupling) of the vibration energy back into the wellbore
The HI TOOL® was selected to provide optimum vibration mitigation and BHA protection while drilling, and was positioned above the logging while drilling (LWD) tool. This would decouple the drillstring from the important directional tools in the lower BHA. By protecting the lower BHA, the rotary steerable system (RSS) would track truer and the bit would stay directly engaged to the formation enabling more efficient drill
For further information, please contact wellconstruction@expro.com.
©2025 Expro. All rights reserved.
EXPRO HOLDINGS UK 2 LIMITED
Registered in England and Wales
Company number: 06491951
Registered office address: Second Floor Davidson House, Forbury Square, Reading, Berkshire, United Kingdom, RG1 3EU