Case Study
The HI TOOL® was positioned above the core barrels in the bottom hole assembly (BHA) to reduce non-productive time (NPT), increase efficiency by minimizing vibrations and improving core quality, and eliminate unnecessary trips due to partially filled core barrels
For further information, please contact wellconstruction@expro.com.
©2025 Expro. All rights reserved.
EXPRO HOLDINGS UK 2 LIMITED
Registered in England and Wales
Company number: 06491951
Registered office address: Second Floor Davidson House, Forbury Square, Reading, Berkshire, United Kingdom, RG1 3EU