Case Study
Regional first use of HI TOOL® as active fulcrum stabilizer in point-the-bit RSS system gives 100% MWD/LWD detection and trouble-free drilling of directional extended reach drilling (ERD) well
Placing the HI TOOL® in the BHA above the bit and below the point RSS as the active fulcrum point allowed the PDC bit to drill undisturbed by the drill string dynamics, effectively decoupling the shocks that reduce performance, and supporting more effective drilling. Simultaneously, shocks from the formation drilling were isolated and dissipated at the HI TOOL® and not transferred into the drilling system above