Case Study
Expro awarded first fully integrated service package in Mexico – on a critical national project
One HPHT well saw Expro’s downhole tools successfully operated below the rotary table exposed to Bottom Hole temperatures around 168°C (334°F) and downhole pressures above 15,000psi with a high concentration of H2s and Co2, immersed in heavy fluid mud conditions
Originally designed and planned for immersion at these conditions for 10 days; weather and external factors resulted in the DST tools being downhole for almost 50 days – after which they functioned flawlessly to accomplish all objectives!
There was a considerable reduction in DST rig up time as we sent pre-assembled and pre-torqued sections from onshore
Our 15K SWT equipment was exposed to extended and harsh conditions; with no surface leaks and the successful acquisition of high quality, critical reservoir data
The customer rated Expro’s Job Performance score at 100%
For further information, please contact WFM@expro.com.
©2025 Expro. All rights reserved.
EXPRO HOLDINGS UK 2 LIMITED
Registered in England and Wales
Company number: 06491951
Registered office address: Second Floor Davidson House, Forbury Square, Reading, Berkshire, United Kingdom, RG1 3EU