Expro provide invaluable modelling support which prevented incorrect component selection for bottomhole equipment configuration

Customer Challenges

  • eni had a multi-well integrated project in Asia Pacific requiring long intervals (some zones over 100 feet) to be perforated
  • A global track record with eni meant Expro were called upon to provide TCP services
  • To maximise productivity, 7" 12 SPF BH charges were selected
  • The development wells were drilled from drill centres via a 5th generation semi-submersible moored rig in water depths up to 431 meters

Expro Excellence

  • As part of Expro's pre-job preparation, standard 2 7/8" EUE threads were identified during high shock modelling as having the potential to fail given the bottomhole equipment configuration
  • Prior to manufacturing, Expro recommended the threads were changed to 3 1/2" EUE
  • Successful completion of all jobs to date
  • Project management expertise to integrate TCP, DST, well test, slickline, and subsea operations - Expro were also able to mobilise start-up operational and support teams whilst meeting eni's fast implementation times from contract award

Value to Client

  • If modelling had not been performed, the potential for perforating gun failure on a high visibility well could have caused an equipment failure, leaving equipment downhole, requiring a costly fishing operation
  • Three wells have been completed to date, with up to three zones per well
  • 100% of shots fired and no lost time
  • Fast track mobilisation meaning eni could keep the rig working and not face costly standby time and idle crews - eni were able to perforate and test the first two wells as equipment was arriving