Expro was contacted by the customer to carry out the transfer, validation and onsite analysis of their fluid samples which had been taken during open hole logging
This was the first time, this third party had worked with us on open hole sample chambers in the Gulf of Mexico
Our customer was particularly interested in our online fluid identification capability, TurboPVT™ following a presentation we had give to their team
Expro Excellence
Our customer's objectives were to capture:
Reservoir hydrocarbon samples for PVT, flow assurance, fluid compatibility and geochemistry
Formation water samples in wet zones for water properties
Formation fluid samples for H2S/Hg measurement
Expro transferred the open hole samples which had been retrieved by a major logging company during the logging period into shipping cylinders
We have the ability to measure critical properties of the reservoir fluids obtained during the open hole sample transfer using TurboPVT™. Our SmartLab™ also enables us to flash the pressurised samples to determine GOR, API, OBM and whole fluid compositional analysis to C36+
Expro's solution provides validation and detailed characterisation of the captured fluid with minimal sample loss
Expro and the customer worked collaberatively to develop a protocol for the project
Value to Client
Using Expro's TurboPVT™ and SmartLab™ our customer was able to ensure that the samples collected for further analysis were good quality and the detailed compositional analysis allowed early modelling of the fluid properties
The customer was able to quickly learn if the sample met the parameters they expected, allowing a decision to be made on whether to carry out another wireline run to obtain further samples
Expro's main differentiator is our ability to measure permittivity, density and viscosity whilst the sample is being transferred into the transport cylinder, allowing significant gas/fluid properties and phase changes to be monitored in real time with TurboPVT™
Expro technology is independent of the logging provider and is used to optimise decision making re sample quality
Substantial cost savings were made by minimising the requirement for rig days and by producing crucial reservoir fluid parameters for time-sensitive decision making
Typically, a partial PVT analysis onshore in a laboratory would take in the region of 5-10 days but Expro's team provided quality data at the wellsite within hours from when the samples were recovered to the surface
Expro is the only supplier of independent, inline fluid property measurement during sample transfer from sampling tools to shipping cylinders