Expro has over two years TCP/DST proven success with a National Oil Company (NOC) client. Under this contract, they wanted to perforate the production zone using TCP instead of conventional wireline perforation, due to uncertainty in formation pressure caused by suspected compartmentalisation
Sub-hydrostatic reservoir pressure brings another challenge for well completion because of post perforation losses until well activation starts using Gas Lift Valves (GLV)
The high angle deviation in the well was thought to limit perforating options
Expro Excellence
Unlike conventional completion methods where perforating is done before lowering the completion string; hence exposing the formation to damaging fluids for several days. Expro's 'shoot and drop' method run with the completion using an auto-gun release allowed the well to be produced directly after perforating
Expro perforated the well using hydraulic delay firing head with a pyrotechnic time delay fuse and immediately the gas was injected in the annulus to activate GLVs resulting in 100% oil within 8 hours of activation, as compared to ~ 2 days using a 'shoot and pull' method
The gun slide critical angle was studied and it was observed that the well angle was conclusive to deploying a 'shoot and drop' TCP system
Value to Client
The use of the TCP 'shoot and drop' method saved approximately four days of rig time compared to using a conventional 'shoot and pull' technique
By using TCP the client gained four days of additional production
With less exposure time, fluid loss significantly reduced post-perforation; hence associated formation damage was eliminated