Expro’s client were optimizing liner shoe track to avoid challenging drill out with small BHA at high temperature 199°C (390°F), whilst enabling for optimal primary cementing
Expro Excellence
Expro were able to offer a combined solution with SeaCure® RS Cementing and CureCatcher®, which delivered a 1.2m (3.9ft) shoe track and slurry mechanical separation to the shoe
Value to Client
Quality primary cement job with perfect CBL results
Optimized 1.2m (3.9ft) shoe track solution
No clean out trips required
Post cement job full wellbore circulation with work string already at TD