The project was executed at the Chayvo drilling site onshore Sakhalin Island, Russia, an arctic environment with temperatures reaching -40°F and heavy snowfall
The Interim Production Facility (IPF) was required to process early oil and gas production ahead of permanent facility readiness
Design specifications included handling 50,000 barrels of crude oil per day and 150 MMSCFD of gas, incorporating separation, gas conditioning, storage, and utility systems
A 30-month contract was awarded in March 2004 inclusive of a 14-month Lease-Operate Maintain period. Commissioning was achieved by August 2005
The IPF was critical to bring first oil and gas from the Sakhalin-1 project to market, marking the clients first hydrocarbons produced in Russia
Expro Excellence
Delivered full-service solution including engineering, procurement, fabrication, mobilization, and commissioning from Expro’s global hubs in Houston and regional resources
Engineered modular skid mounted process packages designed to withstand harsh arctic conditions, enabling efficient transport and assembly
Coordinated international and local supply chains, utilizing Russian contractors under Expro’s supervision to ensure compliance and safety in challenging conditions
Value to Client
Accelerated timeline allowed the client to achieve order-to-first gas in 15 months, supporting early revenue generation and demonstrating schedule certainty
Provided operational reliability with zero Lost Time Incidents during installation and operations, reflecting Expro’s commitment to safety and quality
Delivered cost-effective modular approach allowing rapid deployment and minimized field construction risk in a remote environment
Ensured capability for smooth handover and integration with permanent facilities once constructed, reducing transition downtime