Case Study

Reducing flaring through gas compression solution

In Brief

Fast-track equipment delivery enabled customer to obtain reduced flared gas gains and optimise production

Customer Challenges

  • Natural gas flaring represents a lost economic opportunity but is also a major source of greenhouse gas emissions
  • Gas was being flared at multiple production sites due to the unavailability of the appropriate processing infrastructure
  • Our customer had a solution but in review was considered unreliable and sub economic

Expro Excellence

  • Expro undertook a detailed comparative study to find an economic alternative to gas flaring 
  • The resulting solution utilised a gas to power compressor at 10 sites
  • Expro delivered, installed and commissioned the compressors within 32 weeks (contract award to first gas)

Value to Client

  • Fast-track equipment delivery enabled customer to obtain reduced flared gas gains and optimise production to meet export commitments and increase life of field
  • Produced Gas to Power compressors were utilised which significantly reduced OPEX costs at the 10 sites significantly increasing customers ROI
  • Customer reduced Green House Gas Emissions across the 10 sites by up to 10,000 Tons CO2e per day