Case Study

Reliable SeaCure mitigates stick BHA - Cementing Tech

In Brief

Reliable SeaCure® cementing mitigates against risk of stuck BHA

Customer Challenges

  • Earlier under-gauge drill out of 20” surface casing can cause stuck BHA or even requiring a 17 ½” clean out trip

Expro Excellence

  • Clinical execution SeaCure® cementing eliminates SSR plugs and shoetrack enabling slim drill ahead

Value to Client

  • Saved SSR plugs, shoetrack, cement head and clean-out bit/BHA costs
  • Shoe drilled out under gauge in 15 minutes
  • Reduced cement job displacement volume by >30m3
  • Saved >10 hours rig time
  • Saved >65MT CO2 emissions
  • Delivered zero NPT service execution

Contact

For further information, please contact wellconstruction@expro.com.