Case Study
An NOC in Saudi Arabia identified a requirement to isolate several perforation intervals across a 4 1⁄2” liner, within an underproducing Oil Well, with e-line being the preferred deployment medium, to shut off the zones with unwanted water production.
The solution, deployable via e-line, had to provide an optimal length of ≤ 30ft, an ID of >3.00” and life of well isolation of water ingress from several perforations around 7,000 ft.
Unwanted water production has a significantly negative effect on Oil production but also has a negative effect on environment through C02 production because of the need for surface water management.
The well data was analysed and our 3.700” OD ReLine WL straddle patch for 4 1⁄2’ casing & tubing was selected as the optimal solution. The ReLine WL straddle patch provides optimal post expansion ID to provide greater access to the wellbore and allow for a maximized production conduit to surface.

In separate deployments, 2 x 3.700” OD patches, 28ft each in length, were deployed on e-line passing a 3.77” ID restriction at 6465 ft. and setting within the 4 1⁄2” 11.6# liner.
Both Reline WL straddle patches were deployed, correlated on depth using CCL & Gamma ray technology, and expanded successfully across the water producing zones.
Our resultant post expansion ID of 3.145” outperforms any other solution on the market for this casing size, and enables continuous access to the reservoir below for further future diagnostics and data gathering.
The well was successfully brought back on-line with a significant reduction in water production from the isolated zones and major uplift in well production.
©2025 Expro. All rights reserved.
EXPRO HOLDINGS UK 2 LIMITED
Registered in England and Wales
Company number: 06491951
Registered office address: Second Floor Davidson House, Forbury Square, Reading, Berkshire, United Kingdom, RG1 3EU