Case Study
VERSAFLO™ Switch successfully fill-up while tripping in/out for an acid job in the Gulf of Mexico
A major offshore operator in the Gulf of Mexico was seeking a solution to fill and circulate the lower completion assembly in a recent deepwater well. The lower completion consisted of three different string sizes including 4 1/2”, 5 7/8”, and 6 5/8”. The operation required multiple fluids to be filled and circulated including acid. To minimize rig time connecting the top drive into the string and changing saver sub for each drill pipe size, the VERSAFLO™ Switch was utilized to fill, circulate, and rotate the work string
For further information, please contact wellconstruction@expro.com.
©2025 Expro. All rights reserved.
EXPRO HOLDINGS UK 2 LIMITED
Registered in England and Wales
Company number: 06491951
Registered office address: Second Floor Davidson House, Forbury Square, Reading, Berkshire, United Kingdom, RG1 3EU