Case Study

ONEFIT™ allows GOM operator to eliminate manufacturing lead time and excess inventory

In Brief

A Gulf of Mexico E&P company wanted auto-fill float equipment on a short timeline without increasing their inventory.

Product Line

Customer Challenges

While planning a 7 3/4” liner string, a Gulf of Mexico Deepwater operator was looking for auto-fill float equipment on a short timeline but was concerned about increasing their inventory with customized casing accessories due to unused backup equipment

Expro Excellence

The ONEFIT™ was selected, giving the operator a versatile solution for a float collar, landing collar, and guide or float shoe assembly. The ONEFIT™’s threadless interface removed the need to purchase float equipment with matching threads and metallurgy of their existing casing and required no additional manufacturing

Value to Client

The ONEFIT™ simplified operational logistics by providing an “off-the-shelf” solution that covered multiple well conditions. It eliminated the lead time required for manufacturing traditional float equipment and allowed the customer to have a back-up float system during operations without the requirement for customer-owned inventory after the job was completed

Contact

For further information, please contact wellconstruction@expro.com.