Offset well troubles with SSR plug non-bump and time consuming drill out.
Expro Excellence
Expro provided a clinical execution of our SeaCure® cementing service, delivering low risk, high value cementing operations.
Value to Client
Delivered the 30” conductor cement job, enabling 53 bbls reduction in planned cement job (260% OH XS actual vs 300% OH XS planned)
Both 26” and 17 1/2” bits drilled to TD with no issues
No BHA failures in either 26” or 17 1/2” sections
Enabled continuation of 20” cement job after bulk delivery valve actuation replacement mid-way through cement job vs pumping 231 bbls of cement to the sea and re-commencing the job.