Reposol Sinopec Resources UK Ltd requested an independent technical study of 28 wells that had the potential to add incremental production from their assets
The objective of the project was to quantify and estimate the cost of the additional production opportunities. The four work categories evaluated were:
Artificial Lift optimisation - Gas Lift Valve deepening and evaluation of ESP change out benefit
Petroleum Behind pipe - additional perforations and water shut off
Evaluation of Water Injector optimisation strategies
Resolution of well access/integrity issues - Coiled Tubing clean out and fishing
The well hopper project output would inform the forthcoming 2020 business plan and associated work schedules
Expro Excellence
Expro leveraged the expertise of our Petroleum Engineering Solutions team and Well Intervention capabilities to create a unique value proposition. This time-bound project was delivered on schedule because the Expro team were flexible, communicated well and were quick to adapt to changing circumstances
Repsol Sinopec received detailed credible production projections and well intervention costs in order to make important investment decisions for each well
The key Engineering disciplines engaged were Reservoir Engineering and Production Technology
Value to Client
Incremental production opportunities were calculated by comparing production models following interventions with 'do nothing' scenarios
Intervention cost estimates were built from detailed intervention work scopes
Expro applied consistent workflows that modelled opportunities across six assets
Reposol Sinopec's work programs will change as a result of these new insights