The customer required a solution to place a nitrogen cushion in the well by unloading heavy brine (9 PPG) from their 7” completion prior to perforating the well
Drilling Rig deck space was limited as a full well test package was rigged up as part of the well commissioning project
The use of a traditional Coiled Tubing package would have significant planning and scheduling implications for the project
Expro Excellence
Expro proposed the CoilHose™ Light Well Circulation System for this work scope
The CoilHose™ Light Well Circulation System is a hybrid well intervention system that combines the operational efficiency of a wireline deployment with a capability to perform a range of nitrogen and fluid pumping applications in the wellbore
The CoilHose™ package has a smaller footprint, fewer lifts and lower crew size vs a Coiled Tubing package
Expro engaged with a local partner for the Nitrogen pumping aspect of the service
The CoilHose™ system was in the well for 7 hours, during which 119 bbls of 9 PPG Brine was unloaded, whilst pumping Nitrogen at a rate of 550 scf/min
The CoilHose™ operation was completed with no Health, Safety, Environmental or Service Quality incidents
Value to Client
The customer needed to unload their 7” completion to Nitrogen to a depth of 1,100m.MD. This objective was successfully achieved with 119 bbls of 9 PPG Brine being displaced from the well
The customer was then able to successfully perforate their well underbalanced as per programme
The small footprint and operationally efficient solution made planning and scheduling more straightforward versus the Coiled Tubing alternative