A long-standing customer was looking to create a hydrocarbon free platform safely and efficiently for decommissioning operations
The customer was considering alternative ideas and new concepts to perform a plug and abandonment (P&A) decommissioning campaign, utilising a jack-up platform without a drilling derrick
Their primary focus was on delivering operational safety efficiencies to support rig time savings
Expro was chosen for their Slick-E-Line (SEL) capability that enabled all well intervention operations to be performed on one deployment method
Expro Excellence
Expro utilised a single deployment method solution, Slick-E-Line eliminated the need for polybutene grease normally utilised in E-Line operations
Our solution offered the customer a compact system with a smaller footprint, less personnel on board (POB) which could be rapidly deployed safely and cost efficiently
The operation reduced the project carbon footprint, minimising the runs in the hole and completing the operation ahead of schedule
Value to Client
7 wells were abandoned as per programme
The customer benefitted from a reduction in safety exposure due to the reduced rig up/ down/lifting operations, resulting in 16 fewer runs in hole compared to previous campaigns
The customer improved their P&A efficiencies and reduced rig time by 20%