Case Study

Non-Hazmat Kinley Perforator technology enables fast track retrofit gas lift installation in offshore platform wells

In Brief

Fast Track retrofit gas lift solution gets wells back into production

Customer Challenges

  • A customer in Oman experienced Electrical Submersible Pump (ESP) failures on two of their offshore platform production wells
  • Working over the wells to replace the ESPs to re-instate production would be costly and time consuming
  • The customer had available gas capacity to re-inject on the Platform, so they contacted Expro to model and propose a retrofit gas lift solution for the two wells

Expro Excellence

  • Expro modeled the retrofit gas lift solution for both wells in five days
  • The solution avoided the need to contract a jack up rig to perform the well workovers
  • The solution was mobilized in fourteen days
  • The Slickline deployed, non-hazmat Kinley Perforator system is able to be mobilized by air, sea and land to any location around the world without the need for dangerous good declarations or permits
  • Three runs were performed in the two wells installing Orifice Check Valves with sizes 12/64”, 14/64”and 16/64”

Value to Client

  • This solution resulted in the two wells being brought back into production in the most operationally efficient manner possible
  • When production was re-instated the first well flowed at a rate of 3,500 Bbls/ day and the second well flowed at a rate of 4,000 Bbls/day
  • The rigless retrofit solution enabled the customer to avoid costly and  time consuming workovers with a Jack-up Rig

Contact

For further information, please contact wellintervention@expro.com.