The customer operated nitrogen storage caverns onshore in the UK, the caverns consisted of two wells, one used for N2 import and export with an 9 5/8" string and the other for monitoring purposes
The customer had a history of issues with salt blockages at various points in the well, restricting import and export (production)
Previous attempts at removing the salt blockages with conventional high pressure jetting had some success but were limited due to the depth the jetting system could be deployed
Expro Excellence
Our CoilHose system was selected as the optimum method for jetting and to conduct a memory camera survey in order to reinstate the N2 cavern back into production
Expro supplied a reduced package footprint of equipment compared to conventional Coil Tubing and flexibility to offer CoilHose, Cased Hole memory services and a Well Test fluids handling package greatly reducing mobilisation time, rig up times and crew size
A collaborative approach to developing the well programme with the customer
Pre-mobilisation SIT ensured confidence in the effectiveness of the proposed jetting solution
Value to Client
Expro's delivery of the CoilHose technology reinstated the cavern back into production by utilising the jetting BHA and downhole memory camera
Two runs were performed with five jetting passes and a memory camera survey with no missed runs
The camera survey was performed after the jetting clean-up to evaluate the effectiveness of the CoilHose application
All programme objectives were achieved
Excellent cooperation and collaboration between Expro and the client during the project
This project demonstrated our collaborative approach with three product lines supporting one operation. The three product lines were CoilHose, Well Test and Cased Hole