Marathon awarded Expro a contract to provide conveyance service for modular perforating operations with slickline on the Alba Field, off Equatorial Guinea
Some of the wells were 14,000ft deep and deviated, as well as underbalanced
Expro Excellence
Expro’s team determined a new, larger gauge slickline wire would be required which would overcome the challenge of larger gun size and pulling wireline weights never previously attempted
The very first, production and operation of the largest gauge slickline with a diameter of 0.160” was invented and installed by Expro
Ran a number of 48ft, 3 3/8” perforating guns on slickline and stacked them in lengths exceeding 1,000ft
Firing head was run last on the top and the guns, detonated – the same slickline wire retrieved the firing head and guns before the guns deteriorated to a dangerous condition
Due to presence of CO2 in the reservoir the wire had to be made of a particular alloy (GD 31MO) to reduce corrosion risk, however this created further challenges for the team
All equipment certified for zone 1 and 2, and work was carried out to UK North Sea standards
The entire operation was completed quickly - wells were perforated in underbalanced conditions
Value to Client
Innovative approach by Expro provided Marathon with a world-first solution
Saved Marathon time and money – much quicker than conventional braided line, as well as solving many of the well control issues braided wire might create
Guns run faster and using less equipment
Estimated savings of 25% in running costs compared to braided wire method