An operator with a large number of producing black oil wells had downhole Electrical Submersible Pump (ESP) systems with gas separation systems installed to augment production
The ESP systems were subjected to higher gas rates and varying pressures from the initial design specification
The customer did not have individual well monitoring in place and therefore had no visibility on the well inflow performance and on the efficiency of the downhole separator
The customer was facing shutting down the ESP systems to reduce the production rate to avert catastrophically damaging the ESP and avoiding a costly work over
The customer approached Expro for an non-intrusive solution
Expro Excellence
Expro proposed utilising a non-intrusive methodology to monitor and provide reliable measurements
These measurements were taken at the wellhead without the need to modify the well configuration
Expro were able to measure intake pressure, Producing Bottomhole Pressure (PBHP) and Annular Gas Flow measurements directly at the surface wellhead in real time
Value to Client
The customer received reliable measurements, which gave them insight into the pump and well inflow performance, giving the customer an understanding of how their well was performing
The annulus gas rate provided by Expro gave the customer an indication of the downhole separator efficiency
The customer was now able to access ESP and well performance monitoring, results were input to reservoir models and nodal analysis
The customer used this insight to increase pump and separator performance and maximise production from the well
Expro provided the customer with a non-intrusive solution from the surface. There was no requirement to break pressure containment and surveillance was performed within one working day